文章摘要
宜昌市伍家岗长江大桥主跨为1160m双塔钢箱梁悬索桥,主塔上横梁采用牛腿托架法现浇施工,采用塔梁异步施工工艺。主塔上横梁体积大,且位于150m高空,采用落地式钢管支架施工难度大、风险高。上横梁托架采用可周转牛腿,避免了在塔柱内开槽口,施工方便快捷。本文结合宜昌市伍家岗长江大桥上横梁施工实例,介绍了上横梁托架结构及托架安装及整体拆除技术,以及可周转牛腿的应用,可有效节省材料,缩短项目工期,是一种经济合理的方案,可供类似工程参考。
文章关键词
悬索桥;桥塔;上横梁;托架设计;施工
参考文献
[1] 靳会武.泰州长江公路大桥横梁施工支撑牛腿设计[J].徐州建筑职业技术学院学报,2009,9(4):45-47.(Jin H W, Design of supporting
corbel for beam construction of Taizhou Yangtze River Highway Bridge[J]. Journal of Xuzhou Construction Vocational and Technical
College, 9(4): 45-47.(in Chinese))
[2] 赵成贵.公安长江大桥主塔上横梁施工技术[J].上海公路,2019,3:41-45.(Zhao C G, Construction technology of upper beam of main
tower of Gongan Yangtze River Bridge [J]. Shanghai Highway, 2019,3:41-45. (in Chinese))
[3] 张德致,张敏,代皓,邓永锋.黄冈公铁两用长江大桥桥塔上横梁施工技术[J].桥梁建设,2013,43(3):5-10.(Zhang D Z,Zhang M,Dai
H,Deng Y F. Construction technology of upper beam of bridge tower of Huanggang highway railway Yangtze River Bridge[J]. Bridge
construction, 2013,43(3):5-10. (in Chinese))
[4] 易季爰,宋达,易继武.荆岳长江公路大桥 29#墩索塔上横梁施工新工艺[J].中外公路,2010,30(5):190-192.(YI J Y,Song D,YI J W. New construction technology of upper beam of cable tower of Jingyue Yangtze River Highway Bridge 29# pier[J]. Sino foreign highway, 2010,30(5):190-192. (in Chinese))
[5] 陈文博.高空大吨位预应力混凝土上横梁施工技术[J].公路交通科技,2013,99(3):153-155.(Chen Wenbo. Construction technology of
high-altitude Large Tonnage Prestressed Concrete upper beam [J]. Highway traffic science and technology.(in Chinese))
[6] 王汉章,曹振杰,兰晴朋.宜昌伍家岗长江大桥下横梁施工过程内力分配模式研究[J].中外公路,2021,41(3):135-140.(Wang
Hanzhang, Cao Zhenjie, LAN Qingpeng. Study on internal force distribution mode during construction of lower beam of Wujiagang
Yangtze River Bridge in Yichang [J]. Chinese and foreign highways. (in Chinese))
Full Text:
DOI