由于将建筑工程分包成更小的包的普遍做法,分包已成为建筑业中一种有吸引力的技术。有效的分包商选择和监督减少了问题,同时也决定了建筑公司的绩效。建筑施工项目中分包商的参与会导致与主承包商的关系,这将影响项目的成功。本研究的目的是研究主要承包商如何选择分包商,并分析主要承包商与分包商之间的关系对项目绩效的影响。本研究采用描述性调查方法,研究影响主承包商和分包商之间关系的潜在特征及其对施工项目绩效的影响。研究结果证实,大多数承包商依赖分包商执行其工作,因此,分包商的采购和管理对施工项目的绩效有很大影响。还发现,分包商通常完成20%至50%的工作。主要承包商使用分包商主要是为了提供熟练劳动力,降低管理费用,减轻自己的工作和财务负担。主承包商和分包商之间问题的主要原因包括主承包商延迟付款、分包商缺少训练有素的人员以及分包商在特定项目上的调度冲突。为了消除对立关系,该研究建议建立基于信任的合作伙伴关系,将分包商纳入合作战略。此外,为了优化施工项目绩效,更简单、完整的分包文件将改善主承包商和分包商之间的互动。
文章关键词
建设项目;主承包商;分包商;关系;迪雷达瓦
参考文献
[1] Abdullahi, A. H. (2014). Review of Subcontracting Practice in the Construction Industry. Journal of Environmental Sciences and
Resource Management, pp. 85-96. [2] Abebe D. G. (2020). Assessment on Impact of Covid-19 on Ethiopian Construction Industry. International Journal of Engineering
Science and Computing, Volume 10 Issue No. 7, pp. 26889- 26894. [3] Ankrah, N A and Proverbs, D (2005) A framework for measuring construction project performance: overcoming key challenges of
performance measurement. In: Khosrowshahi, F (Ed.), 21st Annual ARCOM Conference, 7-9 September 2005, SOAS, University of
London. Association of Researchers in Construction Management, Vol. 2, 959-69. [4] Arain, T. E. (2012). Major causes of problems between contractors and subcontractors in the Gaza Strip. Journal of Financial
Management of Property and Construction, 98-112. [5] Cartlidge, (2017), Quantity surveyors’ pocketbook, (3rd ed.), Routledge Taylor & Francis Group, New York. [6] Creswell J, (2009). Research Design Qualitative, Quantitative, and Mixed methods approach. (3rd ed.). California, USA: Sage Publications. [7] Egwunatum, S. (2017). A review of construction project performance estimators. MOJ Civil Eng.; 3 (4): 326‒328. [8] The Emperor of Ethiopia the Civil Code of Ethiopia, (1960). [9] FIDIC Condition of Contract for Construction, (1999). [10] Henok, A. H. (2018). Determination of Subcontracting Performance in Road Construction Projects: Case of Addis Ababa Road
Projects. Journal of Scientific Engineering and Research (IJSER), 1-17. [11] Kasahun H, (2019). Study on The Relationship Between Main Contractors and Sub Contractors in Public Building Construction Projects in Bahir Dar. MSC thesis in Construction Technology and Management, Business Administration, Bahir Dar Institute of
Technology. [12] Kish, L. (1965). Factor analysis of interface problems among construction parties. Journal of Business & Industrial Marketing, pp. 60-71. [13] Kothari C., (2004). Research Methodology: Methods and Techniques (2nd ed.). New Delhi, India: New Age International. [14] Kumar R. (2011). Research Methodology- A step by step guide for beginners (3rd ed), Sage Publications Ltd, London. [15] Lew Yoke-Lian, S. Hassim, R. Muniandy, and Law Teik-Hua, (2012), Review of
Subcontracting Practice in Construction Industry, IACSIT International Journal of Engineering and Technology, Vol. 4, No. 4, August 2012. [16] Mirawati N. A., Othman S. N., and Risyawati M. I. (2015). Supplier-Contractor Partnering Impact on Construction Performance: A
Study on Malaysian Construction Industry, Journal of Economics, Business and Management, Vol. 3, No. 1, January 2015. [17] Mundie (2012), A study on the impact of contractor – subcontractor relationship on the performance of the construction project: A
Case study on the Kenyan construction Industry. [18] Mudzvokorwa (2017), Improving the main contractor-subcontractor relationship through partnering on construction projects, PM
World Journal, Vol. VI, Issue II. [19] Ojo Stephen Okunlola. (2015). The Effect of Contractor-Subcontractor Relationship on Construction Duration in Nigeria. International
Journal of Civil Engineering and Construction Science, Vol. 2, No. 3, 16-23. [20] Public procurement agency (PPA) (2006), Standard bid document for procurement of works, Addis Ababa. [21] Rosli, N. M., Mustaffa, N. E., & Tajul Ariffin, H. L. (2018). A Review of Domestic Subcontract in Construction Industry. Regional
Conference on Science, Technology and Social Sciences (RCSTSS 2016), 499–506. [22] Smith, AJ (2017), Estimating, tendering and bidding for construction: Theory and practice, Basingstoke, London: Macmillan Press Ltd.[23] Shimelis, G. O. (2018). Timely delivery and control mechanisms of 40/60 saving houses projects in Addis Ababa. MSC thesis in Business Administration, Addis Ababa Science, and Technology University. [24] Tayeh, A. (2019). The Relationship between Contractors and Their Subcontractors in the Gaza Strip. MSC Thesis,University of Gaza. [25] Yemisirach, S (2020, December). Study on Contractual Relationship between Main Contractors and Subcontractors and Their Impacts on Main Contractors Competitiveness in 20/80 Bole Arabsa Condominiums. Ababa. MSC thesis in Construction Technology and
Management, Addis Ababa Institute of Technology.
Full Text:
DOI